Data centres in Switzerland

What the global boom means for electricity requirements, electricity grids and digital sovereignty

Summary

Data centres are usually unassuming, functional buildings, yet they form the physical foundation of the digital economy and an ever-growing part of life in our society – from cloud services and digital business processes to research, public administration and artificial intelligence (AI). As the use of these services grows, so too does the demand for electricity and for high-capacity electricity grids and data networks.

Our study, carried out in collaboration with the Association of Swiss Electricity Companies (VSE), examines how electricity requirements from data centres might develop, what consequences this would have for the energy system and the electricity grids, and how the public and the energy sector view their further expansion.

Findings 

The findings show that at a national level, the additional electricity requirements should, in principle, remain manageable. Greater challenges often arise at the specific locations where individual facilities are planned. High connection capacities are coming up against limited local grid capacity, long lead times for infrastructure expansion and unresolved issues regarding the distribution of costs and risks.

About the study

The study combines a scenario analysis up to 2050 with a representative survey of 1,300 people in Switzerland, a survey of 155 VSE members and interviews with experts.

 

The global boom reaches Switzerland

Across the globe, cloud services, digital applications and AI are driving the expansion of data centres. However, the extent to which electricity consumption will rise remains unclear. Increased usage drives up demand, while more efficient hardware and software can help to curb this rise.
The large-scale projects currently under discussion internationally for training the largest AI models cannot be directly transposed to the Swiss context.

Switzerland’s strengths lie more in providing secure, specialised and customer-focused computing services in sectors such as finance, pharmaceuticals, research and public administration. Growth is therefore likely to be driven primarily by cloud and colocation services.

According to a study commissioned by SwissEnergy, Swiss data centres consumed approximately 2.1 TWh of electricity in 2024 – 3.6 per cent of the country’s total electricity consumption.

Electricity requirements up to 2050 – manageable nationally, challenging locally

As it is virtually impossible to predict long-term trends with any degree of reliability, our study examines three scenarios rather than providing a single forecast. Depending on the scenario, electricity consumption by Swiss data centres in 2050 could reach 2.5, 4.8 or 7.0 TWh. In the scenario with strong growth, this would account for approximately one-tenth of Switzerland’s projected total electricity consumption for 2050.

The modelling indicates that even a sharp rise in demand at national level could, in principle, be integrated into the Swiss energy system. This is contingent upon the continued development of domestic electricity generation, import capacity and the electricity grids.

Meeting demand is particularly challenging in winter. Data centres usually require a round-the-clock supply of electricity, while Switzerland is more reliant on imports during the winter months. Photovoltaics contribute to the annual energy supply; however, due to their fluctuating output profile, they are only of limited suitability for meeting constant demand. Imports and reliable domestic production therefore remain essential.

Compared with a scenario with stagnant growth, additional energy system costs would amount to around 200 million Swiss francs per year in a moderate growth scenario, or around 400 million in a strong growth scenario. This equates to less than two per cent of the total energy system costs modelled for 2050.

Skip to description

Three scenarios for data centre electricity consumption by 2050

Annual electricity consumption in TWh • Figures for 2050 represent scenarios, not forecasts

Grid connections could become a local bottleneck

When it comes to grid connection, the decisive factor is not so much total annual consumption nationwide, but rather the power capacity that a specific project requires at a given location at any one time. Large data centres may require connection capacities that are not available locally or regionally within the necessary timeframe.

Differing planning horizons may also come into play. A data centre can be built more quickly than the grid enhancement required to support it. At the same time, not every initial connection enquiry actually results in a project. Grid operators must therefore be able to distinguish between speculative plans and sufficiently concrete projects, without delaying the necessary infrastructure upgrades.

In our survey of VSE members, 86 per cent cited the scale and long lead times of grid expansion as a risk. Added to this is the question of who bears financial responsibility for investments if a project ends up being smaller than planned, is delayed or is abandoned altogether.

Skip to description

Grid expansion is the main risk

However, data centres are not merely a cost factor for electricity grids. As their energy consumption is largely consistent, they can optimise the use of existing and newly built infrastructure. Whether other end customers will also benefit depends on the location, the necessary infrastructure upgrades and the distribution of costs.

The public is open-minded – but not unconditionally

The majority of the public has a neutral or positive attitude towards data centres. Some 55 per cent view them neutrally, 21 per cent somewhat positively and 18 per cent somewhat negatively. Three-quarters would like to see additional computing capacity located, at least in part, within Switzerland.

How the Swiss public feels about data centres

55%

neutral

21%

somewhat positive

18%

somewhat negative

However, this broad support is subject to certain conditions. More than half see AI and data centres as potential drivers of future electricity shortages. If a large data centre is planned near where they live, many people expect it to offer tangible local benefits.

42 per cent say that the use of waste heat for homes or schools is a condition for their approval. 36 per cent expect the operator to foot the bill for the expansion of the electricity grid, and 34 per cent point to the creation of additional local jobs.

Skip to description

Conditions for accepting a data centre in the local area

Waste heat recovery can create local added value, but it is not a practical option in every location. Key factors include the size of the facility, the temperature of the waste heat, the availability of suitable end consumers and the existing heat infrastructure.

Digital sovereignty is becoming a strategic priority

Data centres are not merely consumers of electricity, but also constitute infrastructure that is relevant to economic, innovation and security policy.

Digital sovereignty does not mean that Switzerland has to develop all the necessary technologies itself or store all data within the country. However, it must understand critical digital dependencies, manage them deliberately and remain capable of taking action even in crisis situations.

A Swiss server location alone does not guarantee this. Other relevant factors include the applicable legal jurisdiction, control over data and access rights, and the ability to continue operating applications in the event of a failure, a change of provider or geopolitical conflict.

A realistic vision is therefore likely to be a hybrid one. International providers remain important, while particularly sensitive applications must meet higher standards in terms of control, availability and portability.

Five areas of action for Switzerland

The expansion of data centres should neither be promoted across the board nor restricted as a matter of principle. The key factors are the computing capacity Switzerland requires and the conditions under which it is to be provided.

Shaping digital sovereignty together
  • develop a shared vision for strategically relevant computing capacities under the leadership of the Swiss federal government
  • distinguish between critical applications and standard applications that can be delivered internationally
  • define requirements relating to the legal framework, control, security and operational continuity.
Planning the electricity supply, grids and sites for the future
  • factor the range of possible increases in electricity consumption and the implications for production and imports into national energy planning
  • include specific projects in regional grid planning only once there is sufficient clarity regarding the location, grid connection capacity and timeline
  • coordinate electricity and data infrastructure, land use, heat consumers and local acceptance at an early stage.
Making grid connections transparent and binding
  • increase commitment through project milestones, time-limited reservations, fees or guarantees
  • release capacity that remains unused for a prolonged period, subject to clear criteria
  • regulate access to scarce grid connection capacity in a transparent, non-discriminatory and technology-neutral way.
Allocating costs and investment risks on a clear and comprehensible basis
  • distinguish between project-specific connection costs, shared grid infrastructure and overarching system costs
  • allocate grid and energy procurement costs based on causation, benefit and investment risk
  • before proceeding with expansion, clarify who will bear responsibility for the investments already initiated if a project is subsequently scaled down, delayed or abandoned.
Harnessing efficiency potential and boosting acceptance
  • besides building infrastructure, consider the utilisation and energy efficiency of the IT systems deployed
  • utilise waste heat wherever there are suitable end users and an economically viable heat infrastructure
  • provide transparent information on electricity requirements, grid impacts, local pressures and potential benefits.

The question is not whether Switzerland needs a large or small number of data centres. What matters is the capacity required, how new facilities are integrated into the energy and economic systems and the local environment, and whether they contribute to digital sovereignty in the context of critical applications.