Technology isn't the only, or even main, source of disruption. Increasingly, all it takes is the realisation that social and economic factors enable old technologies to be used in new ways.
The dynamics of disruption are changing from simple disruption due to a specific technological innovation, to complex disruption stemming from a confluence of technological and nontechnological trends.
To identify complex disruption, companies can ask: Is the disruption due to the invention of new technology, or is it due to a combination of factors, of which technology is only one?
To position a firm to capitalise on such disruption, business leaders should identify and invest in the disruptionâs key enabling trends in order to give themselves the real option of capitalising on the opportunity (or not) in the future.
THE global construction industry is a massive enterprise, with aggregate sales of more than âŹ1,098,569 million and a market capitalisation of almost âŹ501,948 million in 2017.1 Like firms in many other industries, builders are wary of âdisruptive technologiesâ: technologies whose adoption significantly changes the way businesses, or entire industries, operate. 3D printing, to pick one example, has been promoted as a potential disruptor in construction.
As we discussed in the article Your next future: Capitalising on disruptive change,2 it is unlikely that any one particular technology will disrupt construction on its own. Rather, itâs more likely that a confluence of trends will enable established technologies to be used in new, disruptive ways. This shiftâfrom simple disruption due to a specific technological innovation, to complex disruption stemming from a convergence of technological and nontechnological trendsâcan be seen across many industries.
The story that follows is one of complex disruption. Its main protagonist, Unitised Building, didnât invent the technologies it is using to build high-rises in places previously thought to be undevelopable. But it and companies like it, recognised that an otherwise unsolvable problem could be solved if the problem was framed differently, using established technologies and techniques in new ways. Because the new approachâunitised buildingâwas seen to have benefits beyond the first project, it attracted investments that helped it grow and mature and become more generally applicable. Today, we might be at the point where this potential disruption is crystalising into actual disruption, especially because the approach has changed at least one communityâs expectationsâexpectations that a regulator is considering making concrete by baking them into regulations, excluding conventional builders from the market in the process.
For the purposes of this case study, we use a narrow definition of construction, one that refers only to the construction of medium- to high-rise buildings of three floors or more for residential, commercial, or mixed use. This excludes the construction of low-rise buildings, individual homes, and suburban apartments. It also excludes infrastructure projects, roads, and unique buildings such as stadiums.
A major challenge facing the construction industry is how to bring unproductive sitesâsites that are currently too challenging to build onâinto productive use. The need is urgent: As societies urbanise, they need to make fuller use of the limited amount of land at their disposal. As more and more land is developed, sites that had previously been too awkward, or even impossible, to build on soon become desirable locations.
One such site was in Melbourne, Australia. Located on Russell Place, close to the middle of the cityâs central business district (CBD), a piece of prime property. Numerous developers had acquired it with the intention to build, but none had been able to do so, and all ended up passing the site on.
The problem was that an electrical substation serving a large portion of the CBD was located directly under the site. Any disturbance could cause the substation to trip, leaving many businesses without power. This led to a number of building restrictions. First, only the air rights to the site were available, precluding the construction of basements for parking or facilities. Second, weight restrictions constrained the mass of any building constructed on the site, along with any construction equipment that might be needed. Finally, the extent of allowable ground vibration during construction was minimal, as undue vibration could trip the substation.
Around 2008, Nonda Katsalidis, an architect whose prior designs include the Museum of Old and New Art in Hobart and the Eureka and Republic Towers in Melbourne, acquired the siteâs air rights. Katsalidis had been thinking about the site for some time, envisioning an approach that might enable him to construct a building within its tight restrictions. The approach: to treat the construction of medium- to high-rise buildings as a design-for-manufacture-and-assembly (DFMA) problem, rather than as a building problem.
Design-for-manufacture (DMF) is an established technique whereby products are designed in such a way that they are easy to manufacture. Katsalidisâs particular twist on the technique was to architect the building so that it could be divided into a set of regular unitsâunitising the building, as it wereâthat would be manufactured and transported to the site, then quickly assembled. This procedure is more akin to LEGOÂź Duplo than the IKEA-like approach used by many building systems that involve offsite manufacture. Rather than assembling building elementsâwalls, for exampleâto speed construction, the building itself is assembled by stacking completed units.
Executing such an approach would require a digital model to be made of the entire building, accurate down to light fittings, power points, washers, hinges, doors, and doorstopsâa building information model (BIM) on steroids. The modelling process would ensure that the connections between building units would be aligned within a few millimetres, making it easy to plug together completed units. The digital model, cut into units, would be used to generate the instructions needed to guide both mechanical and human activity on the unit production line. The finished units would be complete with wiring, plumbing, and furnishings before being transported to the site, and they would be designed to fit inside the envelope of a standard intermodal shipping containerâand to attach to standard container connectorsâto simplify transport.
This approach seemed tailor-made for the Russell Place siteâs requirements. The fully assembled building would be lighter than most similarly sized buildings due to the DFMA manufacturing processâs preference for steel over concrete. The only heavy machinery required to assemble it would be a crane to lift the building units, and the crane would be located in the lane facing the site rather than on the site itself. Vibration would be effectively eliminated, as the vast majority of the work would be completed on a production line elsewhere. The result would be a building and a construction process that worked within the siteâs restrictions.
Katsalidis formed Unitised Building3 in 2008 to capitalise on this idea. The company partnered with building firm Hickory Group4 to create both the tooling required to develop and manipulate the digital models, and the production line to build the units themselves. The partners were able to find off-the-shelf products to create both the tooling and the production line, while the decline in the local car manufacturing industry provided convenient access to the manufacturing expertise needed.
The Russell Place site was the first to host a building constructed with Unitised Buildingâs modular method. Completed in 2010, the building, Little Hero, contains 63 one- and two-bedroom apartments and semi-detached house penthouse residences, all of which sit atop seven retail shops, cafĂ©s, and restaurants. The unitised process not only complied with all of the siteâs restrictions, but also reduced construction time by more than six months compared to a conventional approach: The eight-story building took only four weeks to erect, at a cost comparable to that of a conventional process.
The ideas behind prefabricated buildings, of course, are not new. However, there are three important differences between the unitised building approach pioneered by Katsalidis and Unitised Building, and earlier approaches to prefabricated, modular offsite construction.
First is the focus on medium- to high-rise buildings. Almost all previous prefabricated building efforts have been of low-rise (one- to four-floor) buildings for single dwellings or businesses. Katsalidisâs unitised approach supports the construction of buildings of three or more stories (in fact, the need for a crane to lift building units can make a unitised approach uneconomic for buildings under three stories).
Next is the unitised approachâs ability to construct custom buildings rather than limiting clients to selecting from a catalogue. Previous prefabricated building approaches treated the building as the product: Customers would browse a catalogue and select the building that best matched their preferences, or a company (such as a fast food chain) might work with a manufacturer to add its own needs to the catalogue. In contrast, the unitised building process takes an architectâs design as its starting pointâor an architect can even apply their design to the unitised process.
Finally, the unitised approach involves assembling a set of modular units that are âsnappedâ together onsite. This contrasts with the âkit of partsâ approach of other prefabricated building systems, which require more onsite labour to assemble frames, fill out the structure, and integrate services.
Little Hero was an impressive proof of concept, but unitised building had to become more useful more often before it would be more broadly adopted. As with many other disruptions, it wasnât that the new technique didnât have potential; the question was whether its potential was great enough for firms and clients to prefer it to a more conventional approach. And as with other disruptions, the affirmative answer depended on its ability to address widespread needs more effectively than conventional processes.
For unitised building to become more widely applicable, what had begun as a particular solution to a specific problem had to evolve into a general solution for many problems. The volumetric process used on Little Hero, though successful in its niche, had its limitations. Rooms, for instance, were constrained to fit entirely inside a single modular unit. This was acceptable for a residential building, as a building unit could be designed with a living space at one end, a kitchen in the middle, and all the services gathered at the other end where the common hall was located. This requirement would, however, discourage more general adoption. The Little Hero process also finished the interior of each building unit during its manufacture in the factory. This required some of the same tradespeople, such as plasterers and painters, to attend both the offsite manufacturing process and the onsite installation. It would be more efficient for the tradespeople to ply their craft at either the factory or the building site, but not both.
The short story is that both of these problems, as well as other barriers to adoption, were solved. Modular DFMA building processes have been developed that are capable of building any medium- or high-rise building that a conventional building process can. Rooms can be split across multiple building units, and buildings can contain large voids such as atriums. The workflow has also improved, removing the need for tradespeople to attend both the manufacturing process and the installation. The resulting buildings are indistinguishable from those built with a more conventional process. For instance, the building on the left in figure 3âLa Trobe Towerâwas constructed with the Hickory Building System, 5 a DFMA construction process; at 44 levels, it is Australiaâs tallest prefabricated building. The building on the right is under construction with a conventional approach. La Trobe Tower was delivered 30 per cent faster than the conventional building.
With barriers to adoption reduced, what started with Little Hero in 2010 has since developed into a burgeoning industry, with other firms developing similar processes. An industry body, prefabAUS, 6 was established in 2013 to provide a forum for industry participants to meet and address common challenges. A research and training body, the ARC Centre for Advanced Manufacturing of Prefabricated Housing, 7 was also established in 2015 at the University of Melbourne, with the goal of creating a $15 billion AUD prefabricated housing sector by 2020. 8The industry can be said to have come of age in that year as well, when Business Victoria named Hickory Group its 2015 Manufacturer of the Year (Large Business) for the Hickory Building System. 9
Nor is this all. Good ideas rarely emerge in one location or at one time, and so it is with unitised building. Many builders, and many manufacturers, are experimenting with integrating manufacturing techniques into construction. For instance, Broad Sustainable Building, 10 based in China, is making a name for itself by using a modular building system to construct ever taller buildings in increasingly shorter time frames. It has built a 30-storey building in 15 days and a 220-floor building in just 90 days, 11 with time-lapse videos of the process posted on YouTube. 12 Firms in both the United States and Europe are also developing unitised systems, though with mixed success. 13
A state-of-the-art unitised building process is cheaper, faster, and safer than a conventional building process, while the resulting buildings are indistinguishable from those built via a conventional process. The approach is cheaper and faster because there is less waste during construction. The majority of the work is done in a controlled environment that is not prone to the weather delays or waste management problems that plague construction sites. Onsite work is also more efficient, with all workflows modelled and tested in virtual reality before going onsite, while once onsite a typical unitised building process capable of lifting a new unit into place every eight minutesâand once a new layer of building units is complete, the floor below is weatherproof. And with the majority of manual work done in a controlled environment, and the ability to eliminate live edges while the building is being assembled, a unitised building is safer than a conventional building. (To date, there have been no deaths on a unitised build.) Another benefit of a unitised building is its greater sustainability. The unitised process favours recyclable materials, such as steel, over concrete, enabling a higher proportion of building materials to be reused from decommissioned buildings, while it also enables new, more environmentally friendly materials to be used, such as geopolymers, 14 whose need for cooker curing makes them challenging to integrate into a more conventional building process.
Besides the benefits it can deliver to particular construction projects, unitised building also makes possible a new approach to export. This is because the intellectual property (IP) that underlies the processâthe general parametric models that encode the foundational engineering knowledge needed to construct a building, and the digital models for particular building designsâcan be accessed remotely. Rather than exporting completed building units, or exporting the parametric and building models themselves, it is possible for a firm to retain possession of the models and export only the instructions they generate, to guide the machines and workers in a remote contract manufacturing facility and the remote building site. The models are held domestically, where the engineering talent required to develop and maintain the IP in them is located. The design team, the regulators, the manufacturing facility, the facilityâs machines and workers, and the installation team access the model remotelyâwhether as printed drawings and instructions, an interactive digital representation on a tablet, or an immersive virtual reality (VR) or augmented reality (AR) experience. In effect, this moves the people and machines to the process (virtually) rather than moving the process to the people and machines. 15 Governments and tax authorities facing such a scenario will need to ask: What is âexportedâ when a construction firm constructs a building in a remote geography, but where few staff, no materials, components, or building products, and no IP, are sent overseas, and all the significant value-creating work is done domestically?
At this point, itâs worth considering why the development of unitised building is different in kind from simply applying new technology to improve standard construction techniques.
Construction firms are continually refining practises and integrating new techniques and materials, using technologies such as drones, robots, and GPS tracking to streamline and automate building processes. Unfortunately, these investments in technology are likely to result in only incremental improvement. Integrating new technologies into existing building processes has not transformed the building process itselfâa process which we might date back to the construction of the pyramids, when a confluence of surveying, design, planning, management, and building practises came together to produce some of the worldâs first permanent large-scale structures. A construction firmâs product is the building process, not the buildings; consequently, a builderâs operating model has always been built around this age-old construction process, with their value as a builder depending on the precision of the process rather than different techniques used in the process itself. 16
The greater opportunity is not to merely improve existing building processes, but to explore new and radically different approaches to building as an activity. Rather than simply digitising existing building practisesâswapping analogue measures and tasks for digital ones to make them more precise and effectiveâwe need to digitalise building by shifting the foundation of our operating model to a wholly different premise. 17 Instead of the organisation and prosecution of tasks in the construction process, the operating model in unitised building is based on the management of information about the building, replacing old methods of sharing and managing information with new ones. Not only does this enable the building process to be arranged in new ways, it also makes the process malleableâenabling, in turn, the creation of new operating models.
Digitalisation enables existing business processes (and technologies) to be rearranged. One might, for example, choose to inspect and certify a digital model of a building, rather than the building itself. 18 Or the building process might be made quiet and fast enough (by moving noisy activities from the building site to the factory) that construction need only occur at night, minimising disruption to the lives of surrounding residents. (Both of these things are possible, as weâll see later.)
A new combination of technologies is rarely sufficient for disruption, however. Instead, the trigger which trips a potential complex disruption into an actual disruption may be a change in the social or economic environment. For example, one of the early barriers to unitised building was the lack of a suitable risk model to support financing. Established risk models were built around conventional construction processes, with each funding payment dependent on a quantity surveyor verifying that the last payment had been productively spent on the building site. The unitised approach, though, requires a significant portion of the funds upfront to start the manufacturing process, while the buildingâs actual assembly occurs so quickly that little quantity surveying can take place on the construction site. (Early unitised building projects were at least partly self-funded to overcome this hurdle, while, over time, quantity surveying practises and risk models were evolved, such as quantity surveying the work in the factory, to integrate the new building process.)
One possible trigger to shift a complex disruption like unitised building from a potential to actual disruption, can be a change in community expectations. This can happen in the form of more and more clients demanding the new process. Or it could occur indirectly: a regulator changing the rules to favour the new operating model, for instance. The latter is what appears to be happening with unitised building.
In 2017, Hickory was working on a site in Melbourneâs CBD where access was awkward. The crane that needed to lift building units into place blocked a narrow laneway, making it difficult for local residents to access their properties. To navigate the problem, the firm offered to build only at night: It would lift and position an entire floor of building units outside normal business hours, leaving the laneway free during the day. Both the city council and residents were sceptical that construction work could be quiet enough to happen at night without disturbing the neighbourhood. To prove the approach, Hickory ran a trial build one night, which went unnoticed despite the firm warning nearby residents about it beforehand. With the council and residents convinced that installing building units at night would work, construction went ahead.
The greatest impact of this project may be on Hickoryâs conventional competitors. The buildâs disruption to the local neighbourhood was so minimal that the council is considering mandating similar nighttime builds for all future medium- to high-rise constructions in Melbourneâs CBD. This regulation would implicitly require all new constructions to be done via a unitised building process, as it would not be possible to meet the nighttime noise requirements with a more conventional approach. Nor would a conventional approach be fast enough to construct only at night, and nighttime labour rates would make it uneconomic. With the stroke of a pen, conventional builders could be excluded from the market.
Itâs common to assume that every disruption is due to a particular disruptor, and that the way to get ahead of a disruption is to identify (and invest in) that disruptor early. But in todayâs complex technological environment, this is not always the case. Weâre seeing a shift from simple disruption due to a single disruptor to a more complex form of disruption, where various technological and nontechnological factors come together and enable the creation and spread of new operating models. The unitised building process is a case in point.
This shift from simple, disruptor-driven disruption to complex disruption has significant implications for companies in all industries. Complex disruption is harder to foresee, and even if recognised early, it is more challenging to monitor and understand. It is difficult, if not impossible, to predict the precise shape of the future unitised building operating model, for instance. There are many established technologies to choose from and many equally productive ways to combine them to create a future operating model that has similar benefits. Nor does the timing of the disruption depend on the development of a particular technology. This means that thereâs no technology-development S-curve that we can track to determine when to dip our toe into the pond. The social factors that influence the final shape of the modelâsuch as how a digital building model might be certified rather than the building itselfâare also something negotiated with the community, and there is no ârightâ answer on which we can expect the industry to converge. Consequently, itâs not possible to identify and track the particular future state technologies or regulatory requirements. We also need to be mindful that when the disruption does strike, the transition from the old operating model to new could be quite abrupt, as it wonât be moderated by the need to incrementally improve a new technology.
So how can companies stay ahead of complex disruptions of this sort? If weâre to identify (a potential) complex disruption, we first need to distinguish between it and (a potential) simple disruption. We can do this by critically evaluating the trends shaping our industry or sector. Is the trend due to the invention of new technology, ânew mathsâ? Or is it due to a confluence of factors?
Consider artificial intelligence (AI). Many of the âdisruptiveâ technologies emerging from AI, such as deep learning, have long pedigrees: While there are recent developments in the field, the foundational ideas, the ânew maths,â were set out some time ago. If we turn to the successes ascribed to these technologies, we see that the trigger for many of them was a confluence of environmental trends, rather than improvements in the underlying technique. The mathematical foundations of statistical machine language translation, for example, were laid in the late â40s, 19 though the approach didnât become practical until bilingual texts such as the Canadian Hansard corpus 20 and EUROPARL 21 were made electronically available in the mid-2000s. Similarly, the recent development of autonomous cars depends more on price-performance improvements in computer processors, along with the development of new sensors (such as LIDAR) and centimetre-accurate digital maps, than novel AI algorithms. We might also consider how well formed the idea behind the disruption is. Does it refer to a particular technique, or does it refer to a broad family of techniques that are not otherwise strongly related? AI, for example, is a suitcase term packed with all sorts of otherwise unrelated ideas.
This provides us with a three-part test. First, does the potential disruption involve a truly novel idea (rather than one with a long pedigree)? Second, are the successes ascribed to it due to recent developments in the technique (instead of being due to a confluence of environmental trends)? Finally, is the idea behind the disruption a single, well-formed idea (rather than a suitcase containing many otherwise unrelated ideas)? If the answer to all three questions is âyes,â then the potential disruption is most likely a simple disruption driven by a particular technological development. Obvious examples include the telegraph and the fax machine. On the other hand, if the answer to one or more of the questions is âno,â then the potential disruption is likely a complex disruption driven by a confluence of environmental trends. AI, blockchain, and cyber, all of which became commercially significant only fairly recently, are examples.
To anticipate a complex disruption, we need to predict where the confluence of environmental trends behind the disruption might take us. This can be challenging, as it can require us to question deeply held assumptions about the source of our competitive advantage and competence. For instance, unitised building uses parametric models and design for manufacture and assembly to create a new, and more productive, foundation for building as an activityâcapabilities that traditional builders formerly found no need for.
Itâs not important for our prediction to be precise. What is more important is to identify the underlying environmental trends and understand how they will interact with each other to create value, as well as how they will interact with existing industry practises to create barriers to adoption (such as the way the lack of an appropriate risk model held back unitised building). If we consider AI as a complex disruption, for instance, then rather than focusing on particular AI techniques such as machine learning, weâll broaden our view to consider other AI techniques that are beholden to the same underlying environmental trends. Consider planning engines, which have a pedigree reaching back to the early â70s with STRIPS (Stanford Research Institute Problem Solver); 22 they enable us to compute the optimal way to sequence a collection of related tasks. The environmental trends that enabled techniques such as machine translation and machine learning to emerge from the lab might also enable a firm to replace their carefully designed but rigid business processes with dynamically generated, optimal ones crafted by a planning engine. This would have broad and deep implications for many aspects of a firmâs strategy and operating model, as it would change the trade-off between simplifying processes to enable straight-through processing versus increasing process complexity to support mass customisation.
Finally, to prepare for a complex disruption, firms need to identify and invest in building their expertise in the key enablers for the disruption. With unitised building, the key enabler was the development of a parametric building model and design for manufacture and assembly. With the AI planning example, it might be the development and documentation of a complete set of business APIs, so that all process tasks can be accessed programmatically. The investment in this capability must be treated as a real option, an investment made in an opportunity to have a real choice to capitalise on the opportunity (or not) in the future, rather than as a productivity improvement exercise.
Creating the real option provides a firm with the room to develop the skill sets and expertise required to operate once the disruption crystallises. Without these skill sets and expertise, the firm will find itself confused and unable to respond. With these skill sets and expertise, the firm has the option to either drive the disruption or to be a fast follower. The real option lets us ask the question: What is the value to the firm in the future to have the option of rapidly capitalising on the complex disruption when it crystallises, or even the option of causing the disruption to crystallise earlier?
Construction firms, to return to our case study, have been experimenting with building information models for some timeâbut for many of them, the investment in a BIM was considered a tool to drive onsite productivity. The leap required to develop unitised building was to realise that this digital model could be put at the heart of the construction business. Consequently, digitalisation of construction moves the BIM from something that has to be mandated to happen to being something that is required for a builder to succeed, while the flow-on benefits in maintenance, usage, and emergency management that were the focus of adopting a BIM are now merely its byproducts.
To navigate the future with confidence, organisations need to make the right choices: clear, timely and inspirational choices that deliver growth in a dynamic, disrupted world. Monitor Deloitteâs strategy professionals combine deep industry insights with cutting edge methods to help leaders resolve their most critical decisions, drive value and achieve transformational success.